ADA restroom retrofits in Salt Lake City
An ADA restroom retrofit rebuilds an existing commercial restroom so a wheelchair user can enter, turn, transfer, wash, and leave without help — clear floor space, fixture heights, grab bars, and reach ranges brought to the current standard. Grandview surveys, permits, and builds them across Salt Lake City and Utah County under a B100 general contractor license.

When a full restroom retrofit is the right scope
A restroom retrofit is the answer when the room itself fails — not just something in it. If the only problem is missing bars, grab bar installation is a half-day job. If a 30-inch door is the single barrier, door widening fixes it without touching plumbing. The retrofit scope begins when a wheelchair can’t turn inside the room, the toilet sits too close to the wall for a transfer, or the lavatory has a cabinet where knees need to go. Those are layout problems, and layout means walls, drains, and permits.
Most are commercial rooms — restaurants, clinics, offices, churches — that received a demand letter or are remodeling and learned the restrooms serving the altered area must come along. Homeowners adapting a bathroom want the same dimensions on a different page — our residential ADA bathroom remodel. Unsure which barriers you have? An ADA compliance survey measures the room first.
What the work actually involves
The whole retrofit is driven by one circle and a handful of inches. A wheelchair needs a 60-inch turning space (or a T-shaped equivalent) clear of the door swing, and most existing restrooms are a few inches short. Getting there means one of three moves: shifting a partition into an adjacent closet, combining two small restrooms into one accessible single-user room, or rebuilding a multi-stall room so one stall is a true 60-inch-wide compartment with an out-swinging door.
Then the fixtures get set to the standard rather than to habit. The toilet centerline lands 16 to 18 inches from the side wall, seat 17 to 19 inches high, which usually means relocating the flange. A 36-inch grab bar goes on the rear wall and a 42-inch bar on the side wall, anchored into blocking set during framing, with the flush control on the open side. The lavatory rim drops to 34 inches with 27 inches of knee clearance below, so the vanity comes out, a wall-hung sink goes in, and the pipes beneath are shielded. Mirrors, dispensers, and hand dryers move into the 15-to-48-inch reach range; the door gets a lever handle and tactile-and-braille signage on the latch side. The dimensions are public at ada.gov; we build to them with margin, not to the limit.

Where the plumbing moves, Grandview holds the contract and manages licensed plumbers and electricians; we coordinate, sequence, and quality-check their work within the project. On slab-on-grade buildings that means saw-cutting the floor for the new drain and patching it flush before tile goes down — the step that most often decides the budget. Utah’s hard water shapes fixture choices too: sensor faucets and flush valves scale quickly here, so we specify units with serviceable solenoids and strainers.
How we sequence a restroom retrofit in an occupied building
- Measure and lay out. We draw the turning space and fixture clearances over the existing room and confirm which wall moves and where the drain can go.
- Permit. Moving fixtures and partitions is a permitted alteration under the current Utah-adopted code. Salt Lake City and Provo run established commercial review; Lehi and Saratoga Springs run their own workflows, and we schedule around whichever applies.
- Demolition and rough-in. Fixtures, partitions, and finishes come out; the slab is cut, the drain relocated, blocking set, and the room passes rough-in inspection with the walls open.
- Finishes and fixtures. Slip-resistant floor tile with a coved base, then the toilet, lavatory, bars, partitions, and accessories set to measured heights.
- Verify and document. We re-measure every clearance before the inspector arrives, and you get a photo-and-measurement record for each one.
Restroom retrofits often ride inside a tenant improvement or alongside path-of-travel corrections to the same room; one contract keeps those from colliding.

What does an ADA restroom retrofit cost in Utah?
A commercial ADA restroom retrofit in Salt Lake City typically runs $15,000 to $40,000 as a ballpark planning range. The low end keeps the toilet on its drain and adds a wall-hung lavatory, bars, hardware, and finishes. The high end moves a partition, relocates the drain through the slab, and re-tiles the room. A measured survey turns these numbers into a proposal.
- Whether the drain moves. Shifting a flange even a few inches in a slab means saw-cutting, new waste piping, and patching — commonly the largest line item.
- Where the square footage comes from. Borrowing a closet is cheap; borrowing a corridor raises egress questions.
Questions we actually get
Can we make one of our two restrooms accessible instead of both?
Often, yes. Where space is tight, converting two small gendered restrooms into one accessible single-user, all-gender restroom is a common approach that usually costs less than squeezing clearances into both. Fixture-count rules still apply to your occupancy, so we confirm the count with the city before design is final.
Do I need a permit to move a toilet in Salt Lake City?
Yes. Relocating a drain, moving a partition, or changing fixtures in a commercial building is a permitted alteration under the current Utah-adopted code, with rough-in and final inspections. Verify specifics with your city’s building department, or let us pull the permit as part of the project. Our B100 license is verifiable at dopl.utah.gov.
How long is the restroom out of service?
Three to five working days for a single-user room when the drain stays put; roughly two to three weeks when the slab is cut and a wall moves. We set the dates before demolition and keep a second restroom open, or stage a temporary accessible unit, when the building has no spare.
Why does moving the toilet a few inches cost so much?
Because the drain is under the concrete. Shifting a flange from 14 inches off the wall to 17 means cutting the slab, re-routing the waste line to keep its fall, patching, and re-tiling. In a framed floor the same move is modest, which is why we look at the floor before quoting anything.