Solar + Battery Storage Systems

A solar and battery storage system pairs a photovoltaic array with a lithium battery and a backup gateway, so noon production runs the house at 8 pm and keeps the furnace, refrigerator, and Wi-Fi on when the grid drops. Grandview Contractors coordinates solar-plus-storage across Utah County and Salt Lake County under a Utah DOPL B100 license, managing licensed solar and electrical trade partners and owning permits, placement, and inspections.

Discuss a project   Or call (385) 236-1741

Clean garage wall with cabinets and open floor space, the typical mounting location for a home battery storage unit
Solar alone, battery alone, or both

When solar plus storage is the right choice

Storage earns its place in Utah for a reason that has little to do with blackouts. Rocky Mountain Power credits exported solar at a rate lower than what you pay to import it, so a kilowatt-hour sent out at noon and bought back at dinner loses value. A battery closes that gap.

The second reason is the one people call about. A grid-tied rooftop solar installation shuts itself off when the grid goes down, by design, to protect line crews. Only a battery with a backup gateway lets the array keep working through an outage.

Two siblings cover the edges. If outage protection matters more than solar, a home battery backup system charges from the grid and is the cheaper retrofit. For days of runtime on a well pump and electric heat, a standby generator still wins on cost. When the roof isn’t the right host, the array half can be a ground-mount solar installation.

Contemporary Utah County home with large south-facing glazing on a sunny day, a candidate for a solar and battery storage system
Inverter, battery, gateway, loads

What a solar and battery installation involves

Grandview holds the contract and manages licensed solar installers and electricians; we coordinate, sequence, and quality-check their work within your project, and every license is verifiable at dopl.utah.gov. Four decisions shape the system.

Coupling. A new system is usually DC-coupled: one hybrid inverter takes DC from the panels, charges the battery directly, and inverts once for the house. Adding a battery to an existing array is usually AC-coupled: the old inverter stays and a battery with its own inverter sits beside it, trading a little efficiency to keep working equipment. The Department of Energy’s solar-and-storage overview explains the trade-off plainly.

Chemistry and placement. Nearly every residential unit now is lithium iron phosphate, chosen for thermal stability and cycle life. Lithium will not charge below freezing and loses capacity in heat, so a garage wall or shaded north wall beats a sun-baked west wall or an unheated outbuilding. Current Utah-adopted code limits where storage can sit inside a dwelling and how much can share one space, requires listed equipment (UL 9540 on the label), and in garages requires vehicle-impact protection. We draw the battery, bollard, and working clearances before the city reviewer asks.

Anchorage. A battery can weigh 250 to 300 pounds; in Wasatch Front seismic zones the mount goes into studs or masonry anchors sized for the unit.

Backed-up loads. The gateway isolates the house in an outage so the inverter can run it as an island. Whole-home backup needs enough battery to start the air conditioner; a critical-loads sub-panel carrying the furnace, fridge, well pump, and a few circuits is far cheaper and usually what people choose. The load calculation also tells us if an electrical panel upgrade has to come first.

How the project runs

From load study to permission to operate

  1. Study the loads. Twelve months of utility data and a list of what must stay on. The battery is sized to that list; the array is sized to refill it on a winter day, not a June one.
  2. Design and permit. One permit package for array, inverter, battery, gateway, and panel work, plus the interconnection application. Provo, Lehi, Spanish Fork, and Springville run municipal power with their own interconnection rules; most of the valley is Rocky Mountain Power.
  3. Rough and set. Conduit, gateway, critical-loads panel, and battery mount go in first. Panels and racking follow, sequenced with any solar-ready roof prep in the same contract.
  4. Inspect. We check clearances, anchorage, labeling, and rapid-shutdown wiring before the city inspector arrives. Problems happen. Surprises should not.
  5. Commission and interconnect. A simulated outage proves the island works. The utility grants permission to operate; you get the app, as-builts, and closed permits.
Room plan with tape measure and pen used to lay out battery placement and critical-loads circuits for a solar storage system
Budget

What solar plus battery storage costs in Utah County

As ballpark planning numbers, not a quote: one 10 to 15 kWh battery with a backup gateway adds about $12,000 to $20,000 installed to a solar project, and a complete solar-plus-storage system on a typical Utah County home lands roughly between $30,000 and $55,000 before incentives. Whole-home backup with two or three batteries moves well past that.

Battery count is the biggest lever. AC-coupling onto an existing array adds inverter cost but saves the panels. A panel upgrade or critical-loads sub-panel adds a few thousand; a conduit run from a detached garage adds trenching. Incentives change year to year, so we design around what the system is worth to you and confirm them at contract, moving from consultation to budget range to proposal to fixed price.

Questions we actually get

Can I add a battery to the solar panels I already have?

Usually, yes. An AC-coupled battery sits beside your existing inverter and charges from the array’s output. The catch is compatibility and panel capacity. We review the existing equipment first; if the inverter is near the end of its life, a hybrid replacement can cost about the same and work better.

How long will a battery run my house in an outage?

A single 13 kWh battery runs a critical-loads panel (furnace blower, refrigerator, lights, internet) for a day or more, and the array refills it when the sun is up. Run the central air or an electric range and it drains in hours. Sizing comes down to what you choose to back up.

Where can the battery go, and does the garage count?

Garage walls are the most common location, with the vehicle-impact protection and clearances current Utah-adopted code requires. Shaded exterior walls work if the unit is rated for it; an unheated shed is a poor host because lithium stops charging near freezing. Rules differ slightly by city, and we confirm placement with your building department.

Does solar plus storage still make sense on Provo or Lehi municipal power?

Often, but the math is different. Municipal utilities set their own export credit, time-of-use rates, and interconnection limits, and some treat solar more generously than Rocky Mountain Power. We pull your utility’s current tariff during the load study and size the battery to the way you’ll actually be billed.