Renovation & Build-Outs · MEP & Systems · Electrical

Electrical Panel Upgrades (200A–600A)

An electrical panel upgrade replaces an undersized or obsolete main panel and, where the loads demand it, upsizes the utility service itself to 200, 400, or 600 amps. Grandview Contractors runs these projects across Utah County and Salt Lake County under a Utah DOPL B100 general contractor license, managing licensed electricians and coordinating the utility, the permit, and the patching.

Discuss a project   Or call (385) 236-1741

Detached steel shop with workbenches and cabinets, the kind of load that pushes a home past a 100-amp service
Is a full upgrade the right scope?

When you need a panel upgrade, and when a sub-panel is enough

A panel upgrade is the right scope when the main service is the bottleneck: a 100-amp or 125-amp service in a 1960s to 1990s home that now wants an EV charger, a cold-climate heat pump, an induction range, and a finished basement all at once; a panel with no open spaces and tandem breakers already stuffed in; or a brand the industry has written off, such as Federal Pacific Stab-Lok or Zinsco, which insurers flag regardless of how full it is.

It is the wrong scope when the service has headroom and the panel is simply out of slots. Then an electrical sub-panel fed from the existing main adds capacity for a shop, ADU, or basement at a fraction of the cost. A single EV charger circuit often fits a healthy 200-amp service. And if the panel is fine but the wiring behind it is cloth or knob-and-tube, the real conversation is a whole-home rewire with the panel replaced as part of it. The load calculation decides, and we run it before anyone quotes a number.

Sizing

200, 400, or 600 amps: how the size gets chosen

The number comes from a load calculation under current Utah-adopted code: square footage, fixed appliances, HVAC, the largest motor, and continuous loads like EV charging, with the demand factors the code allows applied, compared against what the service can carry.

200 amps is the standard upsize for most single-family homes: one EV, a heat pump, and an electric kitchen with room to spare. 400 amps on the residential side is typically a 320-amp continuous-rated meter base feeding two 200-amp panels, and it suits large homes, a detached shop or ADU, two EVs plus electric heat, or a home adding battery backup on top. 600 amps is almost always commercial or multi-unit, usually three-phase with current-transformer metering and engineered drawings, planned like a commercial electrical fit-out. Because cold-climate heat pumps are replacing gas furnaces in many Wasatch Front homes and draw real amperage in January, we size for the electrified version of the house.

Hand sketching a load schedule and panel layout before an electrical service upgrade
How the work goes

What a service upgrade actually involves

Grandview holds the contract and manages licensed electricians for this work; we coordinate, sequence, and quality-check it within your project. Their license and ours are verifiable at dopl.utah.gov. The sequence is why a swap takes a few weeks on the calendar and a day on site.

  1. Load calc and utility application. The calculation sets the size, and the utility gets an application for the new service. Rocky Mountain Power serves most of both counties, but Provo, Lehi, Murray, Bountiful, and several other cities run municipal utilities with their own forms, meter specs, and lead times. We handle whichever applies.
  2. Permit. One electrical permit from the city. Provo, Orem, and Salt Lake City review these on a predictable rhythm; Lehi, Saratoga Springs, and Eagle Mountain run busier queues, and we schedule around the real one.
  3. Service entrance. Overhead or underground conductors are sized to the new amperage; underground upsizes may need a new conduit run from the transformer, trenching we coordinate rather than hand off. A 400-amp upgrade usually means a new meter base and an outdoor main disconnect.
  4. Panel swap on a scheduled outage. The utility pulls the meter, the old panel comes out, the new one goes in, and every circuit is re-landed and labeled. New circuits get the arc-fault and ground-fault protection current code requires.
  5. Grounding, bonding, and surge. Ground rods, water-pipe and gas bonding, and the intersystem bonding point are brought current, and whole-house surge protection goes in with the new service.
  6. Inspection and reconnect. The city inspects and signs the utility release, and the meter goes back. We check the work before that visit, then close out any drywall or stucco the new base disturbed.
Basement utility and laundry room where a replacement main panel is typically located
Budget honestly

What an electrical panel upgrade costs in Utah

As ballpark planning numbers rather than a quote: a like-for-like 200-amp panel replacement in Utah County or Salt Lake County typically runs in the low-to-mid thousands, a 100-to-200-amp upsize with a new meter base and service entrance is usually mid-to-high thousands, and a 400-amp residential service commonly lands in the high four figures to low five figures. 600-amp and three-phase services are priced from engineered drawings.

  • Overhead versus underground. New conduit from the transformer adds trenching and utility fees an overhead drop doesn’t.
  • Panel relocation. Moving a panel out of a closet or bathroom to meet working-clearance rules means extending every circuit, often costing more than the panel.
  • Utility charges. Transformer or meter upgrades at 400 amps and above are billed by the utility and pass through at cost.
  • What the old panel hides. Double-tapped breakers or aluminum branch wiring found during the swap become code corrections we price separately, never bury.

Inside a larger renovation, the panel work is sequenced with the rest of the MEP coordination so the outage happens once.

Questions we actually get

How long will the power be off during a panel upgrade?

Plan on most of one working day. The utility disconnects in the morning, the swap and re-landing take four to eight hours, and the inspector’s release gets the meter back the same day when the schedule is coordinated. The weeks before that are paperwork, not outage.

Can I keep my existing panel and just add a bigger main breaker?

No. The main breaker is limited by the panel’s bus rating and by the service conductors and meter base feeding it, so upsizing means replacing whichever of those is undersized, usually all three. A bigger breaker on old conductors is the one thing an inspector fails every time.

Does a 400-amp service need a new transformer?

Sometimes. The utility reviews the load on its transformer when the application comes in, and a shared residential transformer near capacity may need an upgrade before the new service is approved. That is a utility decision on a utility timeline, which is why we file the application before anything else gets scheduled.

Will a panel upgrade also fix my old wiring?

Not by itself. A new panel gives every circuit a modern breaker and proper grounding, a real safety gain, but the wire in the walls stays what it was. If the home has cloth, knob-and-tube, or aluminum branch wiring, we say so up front so you can decide whether a rewire belongs in the same scope.