Rooftop Unit (RTU) Installation
A rooftop unit is a packaged heating-and-cooling system set on a roof curb and ducted down through the deck into the retail, office, restaurant, or light-industrial space below. Grandview holds the contract for RTU replacements and new installs across Utah County and Salt Lake County, managing licensed HVAC contractors, crane operators, roofers, and electricians under our B100 general contractor license.

When a rooftop unit is the right choice
An RTU makes sense when the building has a flat or low-slope roof, the space needs more than a few tons of capacity, and there’s no room for mechanical closets in the lease footprint. Most single-story commercial buildings in Orem, Lehi, Sandy, and West Valley City were built around them, and a unit can be swapped without opening a wall.
The typical trigger is an aging unit — fifteen-plus years old, R-22 refrigerant, a compressor on its third repair — or a tenant change that needs more capacity than the existing unit delivers. If your project is the ductwork, diffusers, and controls inside a space an existing RTU already serves, start with commercial HVAC fit-outs instead. If the building is a house or small office with a furnace and an outdoor condenser, the right page is air conditioner replacement. Ground-up buildings get RTUs designed in through new-construction HVAC.
RTU work usually sits inside a tenant improvement or a roof replacement, which is why it runs through our MEP coordination process rather than as a standalone HVAC ticket.
What an RTU installation actually involves
A rooftop unit touches five trades before it runs: structure, roofing, HVAC, electrical, and gas. Licensed HVAC contractors do the mechanical work; we sequence, inspect, and quality-check each handoff.
- Confirm the roof can carry it. A 3- to 5-ton unit weighs several hundred pounds; a 15- to 25-ton unit weighs several thousand. We check the existing joists against that load; when a replacement is heavier or lands in a new spot, steel dunnage or deck reinforcement goes in first. Bench lots in Alpine, Draper, and Cottonwood Heights carry higher design snow loads than the valley floor, which eats into an older roof’s reserve.
- Set the curb. New installs get an insulated curb, typically 14 inches tall, fastened to the structure and flashed into the roof membrane. Replacements where the new footprint doesn’t match the old curb use a factory curb adapter — far cheaper than a new roof opening, and it keeps the existing supply and return penetrations.
- Tie into the roof. Curb flashing on a TPO, EPDM, or modified-bitumen roof is where most rooftop leaks start. The roofing crew seals the membrane to the curb before the unit lands, and we check that a summer monsoon cloudburst sheds around the curb instead of ponding against it.
- Crane day. The pick is planned around the unit’s weight, boom reach from the nearest legal setup point, and any lane closure the city requires. Old unit off, new unit on, same setup.
- Anchor for seismic and wind. Current Utah-adopted code requires rooftop mechanical equipment to be positively anchored to its curb and the curb to the structure — a direct consequence of building along the Wasatch fault. We treat anchorage as an inspected item, not a detail improvised on the roof. Buildings in the Centerville-to-Farmington canyon-wind corridor get hold-downs checked against uplift, not just gravity.
- Connect and commission. Electricians land the disconnect and feeder; plumbers extend and pressure-test the gas line; the HVAC crew sets the economizer, condensate trap, and controls. Gas-fired RTUs are derated for altitude per the manufacturer — at 4,500 feet in Provo that affects sizing. Then startup, balancing, and documentation.

What drives the cost of an RTU installation in Utah?
Tonnage, crane logistics, and how much of the roof and structure has to change. A like-for-like swap onto an existing curb is the simplest version; a heavier unit in a new location needing steel and a new roof opening is not. As ballpark planning numbers only, light-commercial RTU replacements in Utah commonly land in the low-to-mid five figures installed per unit, with larger tonnage and structural work pushing well above that. We give a line-item estimate after a roof walk, not an allowance.
- Unit tonnage and efficiency tier. Higher-efficiency units cost more up front; ENERGY STAR light commercial HVAC ratings are a fair yardstick for whether the premium pays back.
- Structural reinforcement. Dunnage or deck reinforcement when the unit is heavier or relocated.
- Crane access and permits. Reach distance, setup location, and whether the city requires a lane closure.
- Utility runs. Distance from the gas meter and panel to the curb, and whether the existing feeder is sized for the new unit.
- Roofing tie-in. Minimal on a recent membrane; more when the roof is near end-of-life and the curb becomes part of a larger roofing scope.
Every trade partner on an RTU project holds a Utah specialty license, verifiable with ours at dopl.utah.gov.
Questions we actually get
Do you install the rooftop unit yourselves?
No. Utah requires HVAC, electrical, and gas work to be performed by licensed specialty contractors. Grandview holds the contract and manages those trade partners along with the crane operator and roofer; we sequence the work, inspect the curb and anchorage, and quality-check commissioning. One schedule, one company accountable.
Can the new RTU reuse the existing curb and ductwork?
Often, yes. If the footprint matches, the new unit sets directly on the existing curb; if not, a factory curb adapter bridges the difference without a new roof opening. The supply and return ducts usually stay, but we inspect them — a unit limping for years has often been pushing air through leaky ductwork worth fixing in the same visit.
Does an RTU replacement need a permit and a structural check?
A mechanical permit, yes, and typically electrical and gas permits with it. A structural review is required whenever the new unit is heavier or moves to a new location; many cities ask for it on any replacement. We pull the permits and build the engineering into the scope; verify submittal details with your city’s building department.
How long is the space without heating or cooling?
For a swap on an existing curb, usually a single day: the old unit comes off and the new one lands on the same crane setup, with startup that afternoon. New curbs, structural work, or roof openings add days before crane day, but the old unit runs until the pick, so the outage stays short.

Tell us what’s on the roof
We reply within a couple of hours during business hours — a day at most. You’ll get a straight read on scope, sequence, and budget before anyone commits to anything. RTU work runs under our renovation and build-out umbrella.