Specialty · Accessibility

Accessible entrances & thresholds

An accessible entrance upgrade corrects the door itself: threshold height, the landing on both sides, maneuvering clearance, hardware, and the force it takes to open. Grandview rebuilds entrances for Utah storefronts, offices, churches, and homes under a B100 general contractor license, from the sill pan to the push plate.

Discuss a project   Or call (385) 236-1741

Level paved approach leading to a flush glass entry door on a contemporary building

When the entrance is the problem, not the route

Most buildings don’t fail at the ramp. They fail in the last six feet: a raised threshold, a stoop that has settled into a step, a closer tuned so tight that someone with a cane has to lean on the glass to get in. If the sidewalk and ramp already work, an entrance upgrade is the narrow fix. A 30-inch porch rise belongs on our wheelchair ramp page; an opening under 32 inches clear is door widening, a framing job rather than a door job; and when the fix runs from the parking stall to the lobby, it’s a path-of-travel upgrade with the entrance as one segment.

The calls come from landlords told the front door is the barrier, business owners whose customers keep asking for help with the door, and homeowners replacing a step-over sill before a wheelchair arrives.

What an accessible entrance actually requires

Five things, measured in inches and pounds. The federal standards are public at ada.gov.

  • Threshold height. A half inch maximum, beveled above a quarter inch. Older storefront sills and residential bumper thresholds often run an inch or more; we replace them with low-profile saddle thresholds set in sealant over a sill pan.
  • Level landings. Both sides of the door, sloped no more than 1:48 for drainage. A stoop that has settled into a pitch fails on its own.
  • Maneuvering clearance. A pull-side front approach needs 18 inches of clear wall beside the latch and 60 inches of depth. Planters, bollards, and a second vestibule door hung too close all eat that space.
  • Hardware. Levers, push bars, or pulls that work with a closed fist, mounted 34 to 48 inches above the floor. Knobs and thumb-turn deadbolts come out.
  • Opening force and closer timing. Interior doors are limited to five pounds; exterior doors fall under the current Utah-adopted building code, and closers must take at least five seconds to swing nearly shut. Where an exterior door can’t meet that honestly, a low-energy automatic operator is the answer.

Operators bring one other trade in: Grandview installs the operator, actuators, and door prep, and the power circuit is run by a licensed electrician we hold under our contract and schedule into the same week.

Building entry with full-height glazed doors set flush to a level exterior landing

How we sequence an entrance retrofit

  1. Measure the door, not the building. Threshold height at both edges, landing slope with a four-foot level, latch-side clearance, closer force with a spring gauge. That tells us whether this is a hardware day or a concrete week.
  2. Decide where the inch comes from. A half-inch threshold means lowering the sill or raising the landing. Lowering can expose the slab edge to water; raising changes the step at the sidewalk. We model both before anyone cuts.
  3. Pour or rebuild the landing. Air-entrained concrete, pitched the maximum allowable away from the door, doweled to the existing slab so it can’t settle on its own.
  4. Set the door and hardware. Threshold and sill pan, lever or push-bar hardware, closer timed, push plates mounted outside the door swing.
  5. Verify and photograph. We re-measure every item and hand you dated photos and numbers for the file.
Crew placing and leveling concrete for a new exterior entry landing

What a Wasatch Front winter does to a front door

Freeze–thaw first: a landing holding a skin of water on a January morning is a slip hazard, and over a hundred-odd cycles a year it spalls at the threshold and grows a lip. Air-entrained mixes and a real 1:48 pitch away from the door are the defense.

Soil second. Collapsible bench soils and expansive clay across Utah County and the Salt Lake Valley move front stoops independently of the building. A half-inch threshold a decade ago can be a two-inch step today, so when the stoop has moved we fix the subgrade or dowel a new landing to the foundation instead of shimming the symptom.

Wind third. Exterior doors along the Centerville and Farmington bench, or anywhere a canyon mouth aims at the lot, fight gusts no closer adjustment can satisfy at a reasonable opening force. There, a low-energy operator with a wind-stop arm is how the door passes in both February and July. Our license is verifiable at dopl.utah.gov.

What does an accessible entrance upgrade cost in Utah?

Ballpark planning numbers, not quotes: a threshold replacement with lever hardware on an existing door usually runs a few hundred to about $1,500. A new commercial entry door with accessible hardware and closer is typically $2,500 to $6,000. A low-energy automatic operator with push plates and electrical lands around $3,500 to $8,000 per door. A formed concrete landing rebuild adds $2,000 to $7,000.

What moves the number: re-pouring the landing, a storefront frame too far gone to take a new threshold, vestibules with two doors in series that need 48 inches between swings, and the electrical run to an operator.

Questions we actually get

My threshold is three-quarters of an inch. Do I have to replace it?

Usually not, if it’s beveled. Existing and altered thresholds are allowed up to three-quarters of an inch under the federal standard when the edges are beveled no steeper than 1:2. A square-edged sill at that height fails; the same sill with a bevel strip often passes. New thresholds are held to a half inch.

Can I just add an automatic opener and call the entrance accessible?

No. An operator fixes opening force and closer timing but does nothing for a raised threshold, a sloped landing, or missing latch-side clearance, and the push plate itself must sit on a level surface outside the door swing. We measure the whole entrance first.

Does replacing an entry door require a permit in Utah?

Hardware and a like-for-like door swap generally don’t. Pouring a new landing, changing the frame size, or adding a circuit for an operator usually does, and the work must meet the current Utah-adopted code. Requirements vary by city, so verify with your building department, or have us pull it as part of the job.

Which entrance has to be accessible if my building has several?

At least one public entrance, and in practice it should be the primary one. If the only accessible door is a rear or service entrance, the others need directional signage, and you’ve still built a second-class way in. Our accessibility retrofit overview covers how entrances fit a prioritized barrier list.

Entrance work sits in our specialty family; when the door is part of a larger exterior update it folds into our windows and doors scope under one contract.

Tell us what you’re working on

Send a photo of the door and the step in front of it. We reply within a couple of hours during business hours, a day at most, with a straight read on hardware fix versus landing rebuild.

Request an estimate   (385) 236-1741