Permitting strategy & code consulting
A code and permitting consultant helps owners, developers, and builders pick the right code path, prepare a submittal that survives plan review, and answer correction letters without losing a review cycle. Grandview does this work under a Utah B100 general contractor license — the same license we pull permits with the rest of the week.

When permitting consulting is the right engagement
This is the before-you-apply branch of our construction consulting practice. If the building already failed and you need to know why, that’s defect and forensic consulting. If the disagreement has an attorney attached, that’s expert witness and litigation support. And if your question is what the work will cost rather than whether it will be approved, you want outsourced estimating. Permitting and code consulting is for the window before any of that: the plans exist or are taking shape, and the open question is how they get approved — and how fast.
Typical clients: a developer deciding whether a tenant improvement is a simple alteration or a change of occupancy that triggers a much heavier review; a homeowner whose basement apartment plans bounced twice and who can’t decode the correction letter; a builder entering an unfamiliar jurisdiction who wants the submittal right the first time. In each case the math is the same — one avoided resubmittal cycle usually pays for the engagement.
What a code and permitting engagement covers
The deliverable is usually a written strategy memo, a marked-up plan set, or a drafted correction-letter response — something a plan reviewer or your design team can act on directly. Scopes we take on:
- Code-path analysis. Occupancy classification, alteration level, and whether the scope triggers accessibility upgrades, fire-separation work, or energy-code compliance beyond what you planned to touch. This is where the biggest surprises hide, and where deciding early is cheapest.
- Submittal preparation and pre-review. A reviewer’s-eye pass over your plan set before it goes in — checking that structural details, egress, and site items are shown the way the jurisdiction expects them shown, and flagging where a deferred submittal (trusses, fire sprinklers) is the cleaner move.
- Correction-letter responses. Translating reviewer comments into specific plan revisions, and drafting the narrative response so the resubmittal closes comments instead of generating new ones.
- Inspection and special-inspection planning. Sequencing the inspection card so footing, shear, and framing inspections don’t stall the schedule — including third-party special inspections for epoxy anchors and welded connections, which Utah’s seismic design categories make routine on structural work here.
We advise to current Utah-adopted code — Utah adopted updated I-codes effective July 2026, so a detail that passed on your last project may read differently on this one. Where a requirement is genuinely a local interpretation call, we say so and confirm it with the city’s building department rather than guessing on your behalf.

Why the jurisdiction changes the strategy
Along the Wasatch Front, where you’re building shapes the permitting plan as much as what you’re building. Fast-growth cities — Lehi, Saratoga Springs, Eagle Mountain — run high plan-review volumes with processes that are still evolving, so review queues are longer and a clean first submittal matters more. Established jurisdictions like Provo, Orem, and Salt Lake City are more predictable but have longer institutional memories about what they want to see on a plan set. The strategy memo we write for the same building differs by city, on purpose.
Two more Utah realities do steady work in these engagements. Seismic requirements drive the special-inspection scope on anchored and welded structural connections, and jurisdictions differ in how early they want that inspection agreement filed. And in HOA-dense newer developments, architectural-committee approval runs on its own clock, parallel to the city’s — we map both so neither one becomes the surprise. We see dependencies before they become delays.
What permitting consulting costs
Most engagements run hourly, commonly in the $100–$200 per hour range in Utah, with fixed fees available for defined deliverables like a code-path memo or a submittal pre-review — ballpark planning numbers, confirmed in writing before work starts. What moves the fee: the number of jurisdictions involved, whether a change of occupancy is on the table, how many correction cycles already happened before we arrived, and whether special-inspection coordination is in scope. A single-question code-path consult is a few hours; carrying a contested commercial submittal through approval is not.
Questions we actually get
Can you help after we’ve already received a correction letter?
Yes — mid-review rescue is common. We read the comments against your plan set, separate true code issues from documentation issues, and draft the revision list and response narrative. The goal is closing every comment in one resubmittal, because each additional cycle in a busy jurisdiction can cost weeks.
Do you submit the permit application, or just plan the strategy?
Either. Some clients want a strategy memo and handle submission themselves; others have us prepare the package, submit it, and manage reviewer correspondence through approval. If we’re also building the project as your general contractor, permit management is simply part of that contract.
Do we still need an architect or engineer?
Often, yes — we don’t replace design professionals, and plenty of scopes legally require stamped drawings. What we add is the builder’s and reviewer’s-eye perspective: whether the design triggers requirements nobody priced, and whether the documents are complete enough to pass review. When a structural or architectural stamp is needed, we’ll say so plainly.
How long does plan review take along the Wasatch Front?
It varies more by city and season than by project. Simple residential permits can clear in days to a few weeks in established jurisdictions; commercial and multifamily reviews in fast-growth cities can run considerably longer, especially with resubmittals. We give you a jurisdiction-specific read up front — and verify current queue times with the city before you commit a schedule to it.
Where this fits
Permitting strategy is one branch of our consulting and advisory work, inside the broader planning and project management practice. If the permit question is really the first step of a build, preconstruction and estimating puts numbers and sequence behind it.
Tell us what you’re working on
We reply within a couple of hours during business hours — a day at most. You’ll get a straight read on your code path, your review timeline, and what it will take to get to approved.